Integrated control System(Energy Saving System)
-
Built the waste heat recovery system for Jang Mining S
- 2018.11.30
- |
- 조회수 2319
- 첨부파일이 없습니다.
* Installation period: September 07, 2015 to December 31, 2015
* Performance Guarantee Period: January 1, 2016 to December 31, 2017
* Estimated savings / Purpose of installation: 13.66 million won / Worker's hot water in the bathhouse.