Integrated control System(Energy Saving System)
-
Built the waste heat recovery system for Dogye Mining S
- 2018.11.30
- |
- 조회수 2245
- 첨부파일이 없습니다.
* Installation period: November 03rd, 2016 to December 31st, 2016
* Performance Guarantee Period: November 03, 2016 to December 31, 2016
* Estimated savings / Installation purpose: 10.14 million won / Hot water for washing work clothes.