Integrated control System(Energy Saving System)

HOME > Energy-Saving&Solution > Integrated control System(Energy Saving System)
  • Built the waste heat recovery system for Dogye Mining S

    • 2018.11.30
    • |
    • 조회수 2245
  • 첨부파일이 없습니다.

* Installation period: November 03rd, 2016 to December 31st, 2016

* Performance Guarantee Period: November 03, 2016 to December 31, 2016

* Estimated savings / Installation purpose: 10.14 million won / Hot water for washing work clothes.