Integrated control System(Energy Saving System)
-
Built the EnMS for Dong Eun Forging Co., Ltd.
- 2018.11.30
- |
- 조회수 2233
- 첨부파일이 없습니다.
* Construction period: June to November 2016 (6 months)
* Selected as the best workplace by EnMS in 2016.
* Construction period: June to November 2016 (6 months)
* Selected as the best workplace by EnMS in 2016.